CoolTranz Depot
-
Client Maycroft Construction
-
Location Palmerston North
-
Semtex Involvement Plumbing, hydraulics, drainage, stormwater retention and pump station
-
Project Value $350k +
-
Date Completed 2022
Overview
CoolTranz’s new building provides a hub that allows them to grow their business and streamline their services. The space consists of a 1000m2 EPS panel warehouse and 300m2 freezer, as well as a 195m2 JH Titan office.
The build also consisted of excavations, dock levellers, retaining walls, temperature-controlled services, large scale planting and asphalt.
The build also consisted of excavations, dock levellers, retaining walls, temperature-controlled services, large scale planting and asphalt.